An expired CNE permit (formerly CRE) or SASISOPA can halt your operation.

The most important and highest-risk documents for the energy industry.

Generation permit2031-04Current
Inspection reportexpires in 8 daysExpiring soon
Import permitexpires in 20 daysExpiring soon
Fictional data. Illustrative document map.

Where the risk lies

CRITICAL

Interconnection agreements

Instructed by CENACE and signed with the transmission or distribution company using CNE’s model.

Grid

VALIDITY

Hydrocarbon import and export permits

Issued by SENER, with short validity periods requiring regular renewal.

Supply

OPERATIONS

SASISOPA implementation programs

ASEA authorizes the system and can close a facility in cases of critical risk. Documentary evidence is essential.

Generation

TRACEABILITY

Power purchase agreements (PPAs)

Losing track of price adjustment clauses can have significant financial consequences.

Supply

11 critical documents, grouped by the risk they address

Alongside the corporate foundation every company needs in order: incorporation deed and bylaws, corporate books and notarial powers of attorney.

Fictional data. Illustrative document map.

Regulatory Permits

  • Electricity Generation and Supply PermitsIssued by the National Energy Commission (formerly CRE), with long validity periods and annual compliance conditions. CRE-issued permits can no longer be extended, making expiry dates critical.
  • Hydrocarbon Import/Export PermitsIssued by SENER under the Foreign Trade Law, with short validity periods requiring regular renewal.
  • Inspection Unit ReportsIssued through CNE-approved units to confirm a facility meets applicable standards; they must remain current for operations.

Industrial and Environmental Safety (SASISOPA, ASEA)

  • Environmental Impact Decisions (MIA)Extensive documents with conditions the company must demonstrate it meets.
  • SASISOPA Implementation ProgramsThe industrial safety management system. Evidence of drills, training and logs must be retained.
  • Insurance and Surety BondsCivil liability and environmental damage policies with the amounts required by regulation.

Land and Rights-of-Way Management (Social/Real Estate)

  • Social Impact Statements (MISSE, formerly EVIS)Authorized by SENER to document relationships with project communities. EVIS decisions issued before 2026 remain part of the record.
  • Easement or Lease AgreementsFor pipelines, transmission towers or solar panels.
  • Surface Occupancy AgreementsAgreements negotiated with ejidos or private owners.

Interconnection and Supply Agreements

  • National Electricity System Interconnection AgreementsInstructed by CENACE and signed with the transmission or distribution company using CNE’s model.
  • Power Purchase Agreements (PPAs)Long-term contracts where price adjustment clauses may need to be traced in a document signed a decade earlier.

Which documents does an energy company need for CNE, ASEA and CENACE?

Generation and supply permits now issued by the National Energy Commission (formerly CRE), interconnection agreements instructed by CENACE and, for hydrocarbons, SASISOPA authorized by ASEA. CRE-issued permits remain valid until expiry, but the law no longer permits their extension.

Explore your industry

Each industry has its own page with the full details, available when you need them.

Energy

11 critical documents

You are here

Don’t see your industry? The platform adapts to different document environments.

Talk to a specialist

Your industry has its own critical dates.
Keep them in view.

Request a strategic session to identify your area of greatest risk and leave with a clear plan to get started.

Your privacy preferences

Choose whether to allow optional website analytics. You can change your choice using the link in the footer.

Necessary preferences

Remember your choice and the site’s presentation.

Always active

About cookies and analytics · Privacy notice